Nepal: Junbesi School Upgrade

Junbesi_School_Nepal-smallYear: 2008

Achievements: Renovated the existing school house including the repair and painting of the internal walls. The group also paved a new pathway outside of the school building.

Impact: The new internal walls will ensure that the school building is resistant against the cold temperatures and weather. The painting of the internal walls created a brighter and more positive learning environment. The new paved path ensures the safety of the children since the previous path was uneven and dangerous (see before and after photos below).

Junbesi_school_path_before-small

The state of the path before the work

Junbesi_school_path_Nepal-small

The new path